br: enable parallel restore #8156
integration-test-dumpling.yml
on: pull_request
Matrix: integration-test
Annotations
9 errors
integration-test (8.0.26)
Process completed with exit code 2.
|
integration-test (5.7.35)
The job was canceled because "_8_0_26" failed.
|
integration-test (5.7.35)
The operation was canceled.
|
integration-test (8.4.3)
The job was canceled because "_8_0_26" failed.
|
integration-test (8.4.3)
The operation was canceled.
|
integration-test (8.0.37)
The job was canceled because "_8_0_26" failed.
|
integration-test (8.0.37)
The operation was canceled.
|
integration-test (8.0.22)
The job was canceled because "_8_0_26" failed.
|
integration-test (8.0.22)
The operation was canceled.
|