Skip to content

Conversation

@JornVernee
Copy link
Member

@JornVernee JornVernee commented Oct 31, 2025

The JUnit output was updated to include a timestamp in 470718a

This patch updates the parser in the idea plugin to be able to handle the timestamps.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jtreg.git pull/300/head:pull/300
$ git checkout pull/300

Update a local copy of the PR:
$ git checkout pull/300
$ git pull https://git.openjdk.org/jtreg.git pull/300/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 300

View PR using the GUI difftool:
$ git pr show -t 300

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jtreg/pull/300.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Oct 31, 2025

👋 Welcome back jvernee! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Oct 31, 2025

@JornVernee This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

7904110: IDEA plugin: Update plugin for new message format

Reviewed-by: cstein

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been no new commits pushed to the master branch. If another commit should be pushed before you perform the /integrate command, your PR will be automatically rebased. If you prefer to avoid any potential automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added the rfr Pull request is ready for review label Oct 31, 2025
@mlbridge
Copy link

mlbridge bot commented Oct 31, 2025

Webrevs

Copy link
Member

@sormuras sormuras left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This might be a bit too lenient in some cases, but also supports the new message format.

@openjdk openjdk bot added the ready Pull request is ready to be integrated label Oct 31, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

ready Pull request is ready to be integrated rfr Pull request is ready for review

Development

Successfully merging this pull request may close these issues.

2 participants